Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Water Treatment Plants and NRW Pilot Project for "Extension of Water Resources for Faisalabad City – Phase II"

Solicitud de Expresiones de Interés

Información general

País:   Pakistán
Ciudad/Localidad:   FAISALABAD
Número de Anuncio/Contrato:   01
Fecha de publicación:   8 de Ene, 2019
Límite (hora local):   15 de Febrero, 2019 - 12:00
Organismos de Financiación :   Agence Française de Développement - Agencia de Financiamento
Compradores:   PAKISTAN - Water and Sanitation Agency Faisalabad
Eligibilidad de Licitadores:   Minimum qualification criteria will be as per AFD's Procurement guidelines and Punjab Procurement Regulatory Authority Rules(PPRA,Punjab,Pakistan).
Lengua original:   Inglés

Datos para contacto

Dirección:   ASAD ALI
MR.
Water and Sanitation Agency Faisalabad
WASA HEAD OFFICE OPPOSITE ALLIED HOSPITAL, 38000
38000
FAISALABAD, PUNJAB 38000
Pakistán
Teléfono:   + 92 336 8880226
Fax:   + 92 41 9210054
Correo electrónico:   Presione aquí
Sitio Web:   http://wasafaisalabad.gop.pk

Tareas

 

Documentos de licitación y ficheros adjuntos

 
  • Solicitación : Detailed Expression of Interest (EOI) for Consultancy Services (3 MB; 8 de Ene, 2019)
     Descargar documentos

Texto original

Water and Sanitation Agency of Faisalabad

Country: Pakistan

Project: Extension of water resources for Faisalabad city – Phase II

Credit No. CPK 1038

Assignment Title: Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Water Treatment Plants and NRW Pilot Project


1. The project involves the implementation of the components described below:

Component 1: Increasing of the water production capacity
As part of the project, it is planned to increase drinking water production capacity by 135 000 m3/d through:

- the extension of the existing surface Jhal Water Treatment Plant capacity by 22 500 m3/d

- the construction of a new 112 500 m3/d water treatment plant near Jaranwala Road at Lower Gogera Canal Branch and the distribution/arterial network

These water treatment plants will be implemented on EPC Mode with 3 years O&M period (O&M cost would be financed separately by Govt. of Punjab through its own sources).

Component 2: Non-Revenue Water

The project includes a Non-Revenue Water (NRW) reduction program and the establishment of Zones (District Metering Zones/DMZ and District Metering Areas) through installation of bulk meters, customer meters, SCADA system, leak detection and piloting the concept of 24/7 service.

2. The consulting services of this assignment (“the Services”) include:
• undertaking of topographic and geotechnical surveys,
• Review and finalization of preliminary design and preparation of tender documents,
• assistance to F-WASA in tendering process,
• works supervision services,
• assisting F-WASA in construction completion and commissioning
• Preparation of Safeguards Reports: Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plans (RAP) as per World Bank guidelines.
Por favor note que este aviso es únicamente para su información.
Tratamos lo mas posible de tener la información mas actualizada y detallada en nuestro sitio Web pero no podemos garantizar que toda la información dada está libre de errores.
Si tiene una sugerencia para corregir/actualizar este aviso, por favor háganoslo saber.